Two Charge Qube CQ160 rapid chargers on site

Compact battery energy storage (BESS) and rapid EV charging

The GRID can wait your FLEET can't

Up to 250kW combined rapid charging,
two CCS connectors on every unit.
No DNO application. No grid upgrade. No waiting.

250kW Combined CCS rapid charge
160kWh Energy on board
16A Supply needed

Charge Qube CQ160 combines 250kW combined rapid charging with 160kWh of on-board storage in one compact, self-contained unit. No Distribution Network Operator (DNO) application, no reinforcement costs, no months of waiting, because it runs from a standard 16A or larger connection. No grid upgrade required.

16A in 250kW COMBINED

The CQ160 draws a steady load from your existing supply and releases it as up to 250kW* of DC power, turning any site into a rapid charging location.

*250kW combined. One vehicle charges at up to 150kW. With both charge points in use, power splits 150kW and 100kW.

As we electrify our fleet, our biggest challenge isn't the vehicles, it's grid capacity at our sites. Charge Qube gives us reliable, high-power charging without the lengthy delays and costs of major grid upgrades.
Martin Hunt Director of NHS Blood and Transplant

From delivery to power in three simple steps

01

Delivery

Fellten handles every step of transport and on-site placement. At 2,650kg on an integrated forklift base, the CQ160 arrives in position and ready to operate.

02

Connect

Plug into your existing 16A, 32A or 63A supply. Our engineers commission and configure the system in under two hours.

03

Power

Start charging vehicles and storing energy immediately.

Why the CQ160

The battery sits between your supply and the vehicle. The CQ160 draws power from a standard connection and banks it in lithium iron phosphate cells, then discharges that stored energy rapidly the moment a vehicle plugs in. Charge rate is set by the battery, not by the grid, so a site that could never support rapid charging directly can still deliver it.

Two CCS connectors, up to 250kW combined and up to 150kW to a single vehicle. The 200V to 920V range covers both 400V and 800V vehicle architectures, so cars charge at the rate they were designed for and drivers gain meaningful range in minutes rather than hours.

The CQ160 connects to a standard low voltage supply and draws a modest, steady load to top up its battery. No DNO application, no reinforcement bill and no years on a waiting list. It runs from your existing 16A, 32A or 63A supply, on site and operational in a single day.

Nothing is buried in the ground, so nothing ties the CQ160 to one location. Relocate it between sites as demand shifts, run it on leased land without writing off the investment, or add a second unit as throughput grows.

Battery-powered rapid charging CCS rapid charging connector docked on a CQ160 Charge Qube branding on the side of a CQ160 CQ160 touchscreen interface

CQ160

Rapid charging up to 250kW combined. No DNO application. No major grid upgrades. No waiting.

160kWh
Max energy capacity
250kW
CCS rapid charging
16A
No supply upgrade
7-9vehicles
Daily throughput

CQ450

Ultra-rapid charging up to 240kW, backed by 450kWh of on-board energy storage. Up to 10 vehicles from a standard 32A connection.

450kWh
Max energy capacity
240kW
CCS rapid charging
32A
No supply upgrade
10vehicles
Charging at once

CQ1000

Up to 1,000kWh in a 20ft container. The only unit in the range that can run with no grid connection at all.

1,000kWh
Energy capacity
240kW
CCS rapid charging
63A
No supply upgrade
20ft
ISO container

What the CQ160 costs to run

Live electricity and diesel prices, against what the same vehicles would cost on public rapid charging. Drag the slider to your fleet size. Open the full calculator

How Charge Qube can be deployed

Powering fleets

Powering fleets

Ultra-rapid charging where fleets need it most. Up to 240kW at depots, logistics hubs, and fleet sites.

Rapid grid expansion

Rapid grid expansion

Charge Qube provides scalable storage and charging to bridge the gap where grid capacity is limited.

Temporary sites

Temporary sites

From festivals to construction sites, Charge Qube delivers clean, silent power. No diesel, no fumes, no noise.

Disaster relief

Disaster relief

Charge Qube delivers instant, reliable energy for emergency services, disaster relief, and crisis situations during flood, fire and storm events.

Charge Qube flexible lease

Flexible rental and purchase options for the CQ160

Our team can have your site up and running with a CQ160 in hours, where you can trial the technology to gauge performance, capacity requirements, along with our servicing.

Portable power, ready when the grid isn't

A complete grid in a box. The CQ160 packs 160kWh of storage and up to 250kW of rapid charging into a 2260 x 1340mm footprint, small enough to sit where a parking bay does. No DNO application. No reinforcement bill. No waiting. Deployable anywhere, no major grid upgrades required.

Charge Qube CQ160 alongside the CQ450

Meet your ESG goals with the CQ160

Built and designed for renewable integration, each unit reduces lifecycle carbon impact while supporting business resilience. Deploying Charge Qube demonstrates compliance with environmental targets and strengthens your organisation's ESG reporting.

Sustainability

Estimated up to 25 years lifespan in stationary use, maximising ROI

Second-life battery utilisation reduces waste and extends EV battery lifecycle

Zero local emissions, supporting Net Zero and Scope 1/2 reduction goals

Renewable-ready, integrate solar/wind to meet green power targets

Ready to deploy a CQ160?

Enquire now

Industry-recognised quality standards