Charge Qube containerised EV charging and battery storage range
No G99 • No connection queue

Waiting on your DNO?
Skip the queue.

EV charging and battery storage that runs from the supply you already have, 16A three-phase and up. No DNO application, no grid reinforcement, no months of waiting. Delivered and charging in days.

0
DNO applications needed
Days
To deploy, not months
250kW
Rapid charging from a 16A feed
1MWh
Scalable battery storage

The grid route vs the Charge Qube route

A new grid connection is a project. A Charge Qube is a delivery.

Upgrading your connection

  • G99 application to your DNO, with fees and paperwork
  • Wait for a connection offer, often months
  • Possible network reinforcement at your cost
  • Civils: trenching, cabling, substation works
  • Fixed to one site once built

Deploying a Charge Qube

  • Runs from your existing supply, 16A three-phase and up
  • The battery does the heavy lifting: up to 250kW charging from a small feed
  • No DNO application, no reinforcement bill
  • Delivered, sited and charging in days
  • Move it if your site or depot changes

How it works

From enquiry to charging in three steps.

01

Tell us your supply

Whatever your site has, 16A, 32A or 63A three-phase, that is all we need to know to size the right Qube. No DNO involvement required.

02

We size and quote

Our engineers match capacity (160kWh to 1MWh) and charging (up to 400kW) to your vehicles and duty cycle, with honest numbers on throughput.

03

Charging in days

The unit arrives assembled. Sited, connected to your existing supply and charging vehicles in days, not the months a new connection takes.

Fleet operators: funding is live

The Depot Charging Scheme funds integrated battery storage and charging.

OZEV's Depot Charging Scheme covers up to 75% of eligible costs, capped at £1 million per organisation, for depot charging infrastructure where battery storage is physically and operationally integrated with the chargers. That integration is not an add-on for Charge Qube: it is the product. Application window 2 opens 28 October 2026 and closes 29 January 2027. Talk to us now and have your depot assessment and numbers ready before the window opens.

Book a depot assessment
75%
of eligible costs covered, up to £1M per organisation
28 Oct 2026
application window 2 opens (closes 29 Jan 2027)
BESS + EV
integrated storage and charging is the qualifying requirement, and exactly what a Charge Qube is

Ready to skip the queue?

Enquire now Download brochure