EV charging and battery storage that runs from the supply you already have, 16A three-phase and up. No DNO application, no grid reinforcement, no months of waiting. Delivered and charging in days.
The grid route vs the Charge Qube route
How it works
Whatever your site has, 16A, 32A or 63A three-phase, that is all we need to know to size the right Qube. No DNO involvement required.
Our engineers match capacity (160kWh to 1MWh) and charging (up to 400kW) to your vehicles and duty cycle, with honest numbers on throughput.
The unit arrives assembled. Sited, connected to your existing supply and charging vehicles in days, not the months a new connection takes.
Fleet operators: funding is live
OZEV's Depot Charging Scheme covers up to 75% of eligible costs, capped at £1 million per organisation, for depot charging infrastructure where battery storage is physically and operationally integrated with the chargers. That integration is not an add-on for Charge Qube: it is the product. Application window 2 opens 28 October 2026 and closes 29 January 2027. Talk to us now and have your depot assessment and numbers ready before the window opens.
Book a depot assessmentCertified & Compliant